alcoa.com

Alcoa Power Generating Inc., Yadkin Division
FERC Filings & Reports 
FERC Filings & Reports
License Application for the Yadkin Project

 

FERC Application

The License Application is a multi-volume document some of which are confidential. The link below describes the contents of the application:


Due to size of license application and the confidential nature of some material, only Volume I of the application is available for download. All information (including relicensing study reports and the consultation record) is available upon request.  

 
Copyright © 2012 Alcoa Inc.