alcoa.com

Alcoa Warrick Operations - Evansville
Red Brush Road Project 
Red Brush Road Project Background
Citizens Advisory Committee (CAC)
CAC Members
CAC Meeting Notes
Red Brush Road Updates Archive
August 2008
Red Brush Road Updates Archive
Red Brush Road Structural Fill
Current and Upcoming Activities
 
August 2008
North of Red Brush Road
  • Construction of a haul road that will ultimately be used to haul the structural fill materials keeping the traffic off the public roads
  • Construction of a ramp for access to the Y Pit to place a pump
 
Youngblood Road area north of Red Brush Rd
  • Construction of a drainage ditch on the west side of the Road
  • Construction of a retention pond on the east side
 
Placement of culverts across Youngblood Rd
  • One will connect the north drainage system and the other will connect the south
  • The road will be closed during these times (2 days each) with traffic rerouted to Eble Rd.
  • Proper signage and lighting will be placed
 
Haulage of Gypsum to the west leg of Y Pit
  • On average loading will be done 3 days/week with 3 trucks
  • Total loads per day will be approximately 40
 
Repairs east of Hwy. 61 on Red Brush Rd
  • Roads currently used for hauling will be monitored weekly for any needed repairs
 


New haul road running North of Red Brush Road


Creation of a sedimentation pond East of Youngblood Cemetery Road

Copyright © 2009 Alcoa Inc.