Red Brush Road Structural Fill Current and Upcoming Activities August 2008 North of Red Brush Road
- Construction of a haul road that will ultimately be used to haul the structural fill materials keeping the traffic off the public roads
- Construction of a ramp for access to the Y Pit to place a pump
Youngblood Road area north of Red Brush Rd
- Construction of a drainage ditch on the west side of the Road
- Construction of a retention pond on the east side
Placement of culverts across Youngblood Rd
- One will connect the north drainage system and the other will connect the south
- The road will be closed during these times (2 days each) with traffic rerouted to Eble Rd.
- Proper signage and lighting will be placed
Haulage of Gypsum to the west leg of Y Pit
- On average loading will be done 3 days/week with 3 trucks
- Total loads per day will be approximately 40
Repairs east of Hwy. 61 on Red Brush Rd
- Roads currently used for hauling will be monitored weekly for any needed repairs
|
 |
 New haul road running North of Red Brush Road
 Creation of a sedimentation pond East of Youngblood Cemetery Road
|