Titanium LGP® Stump Type Lockbolts : Technical Information : Installation Sequence

Installation Sequence

Stump Lockbolts Typical of LGPS18SC, LGPS2SP, LGPS4SC & LGPS4SP Fasteners
 
Step 1
The pin is inserted into the hole with a transition or interference fit from one side by the drill riveter machine. The collar is automatically feed to the pin and placed over the locking groove section.

 

Step 2
The swage anvil then moves into position and begins to develop clamp-up while swaging the collar. The pin is supported by the upper ram of the drill riveter machine during the swaging action


Step 3
Collar swage is complete when the drill riveter machine reaches the pre-set swage force. At this time clamp force has been generated due to the extrusion of the collar that creates a corresponding stretch of the pin. The retained clamp load developed is over 50% of the fastener ultimate tensile.


Step 4
The swage anvil is ejected by machine ejection force after collar is completely swaged. The installation is complete.






Viewing documents in PDF format requires Adobe Acrobat Reader, which is available as a free download from the Adobe Web site.




Related Documents
How to Order [41KB]


Related Information


Automated Installation Equipment


Engineering Standards


Mechanical Properties

Contact Information
Americas & Asia/Pacific
Customer Support
Alcoa Fastening Systems & Rings Aerospace
800.992.4444
805-527-0900

Email

Technical Support
Alcoa Fastening Systems & Rings Aerospace
310.784.6409
Email

Europe Customer / Technical Support
Alcoa Fastening Systems & Rings Aerospace
+49 8251 8757-0
+49 8251 1652

Email