Location
Uruguai River between Piratuba (SC) and Maximiliano de Almeida (RS).
Municipality on the right bank: Piratuba (SC).
Municipality on the left bank: Maximiliano de Almeida (RS).
Start of construction work: March, 1998.
Conclusion: July, 2003.
Reservoir
Total area: 79 km2.
Min. operating level: 465 m.
Max. level: 485.36 m.
Flooded area: 56.7 km2.
Lake perimeter: 500 km
Total stored volume: 3.3 km3.
Useable stored volume: 1 km3.
Average depth: 30 m.
Basin drainage area: 32,050 km2.
Dam
Type of structure / material: junction dam, faced with concrete.
Height of the crest: 485.50 m.
Max. height: 126 m.
Length of the crest: 700 m.
Socio-environmental actions
Families resettled and compensated: 2,076.
Rural centers covered: 3.
Reforestation and conservation of native forest vegetation: 1.1 million saplings.
Infrastructure
Properties covered: 1272.
Electricity network reinstalled: 24 km.
Roads relocated and improved: 185 km.
Mains water network: 27 km.
Spillway
Type: surface.
Max. outflow (exceptionally): 35,703 m³/sec.
Number of sluice gates: 8.
Intake channel
Type: alleviated gravity.
Length: 61.20 m.
Max. height: 47.20 m.
Number of individual intake channels: 3.
Dikes
Number: 2 (on land).
Length of the crest: 394/336 m
Max. height: 22/31 m.
Municipalities coming under the area of influence of the power plant:
In Santa Catarina: Piratuba, Zortéa, Celso Ramos, Anita Garibaldi, Campos Novos and Capinzal.
In Rio Grande do Sul: Machadinho, Maximiliano de Almeida, Barracão and Pinhal da Serra.
|