Location
Located on the Pelotas River, between Anita Garibaldi (SC) and Pinhal da Serra (RS)
Municipality on the right bank: Anita Garibaldi(SC)
Municipality on the left bank: Pinhal da Serra (RS)
Start of work: July, 2001
Conclusion: May, 2006
Reservoir
Total area: 94 km2
Dam
Type of structure / material: junction dam, faced with concrete
Height: 185 m.
Length: 665 m.
Base: 500 m. wide
Top: 11 m. wide
Socio-environmental activities
Families resettled and awarded compensation: 1.520
Awarded compensation: 959
Resettled: 561
Spillway
Type: surface
Height: 21 m.
Width: 15 m.
Number of sluice gates: 6
Maximum probable outflow: 23.84 m3 per second
Intake channel
Length: 24.3 m.
Height: 52.3 m.
Number of individual intakes: 3
Diversion tunnels
Number: 2
Length: 864 and 935 m.
Height: 17 m. (both)
Energy
Power of the hydro-station: 708 MW
Installed capacity: 696 MW
Guaranteed power: 380 MW
Turbines: 3
First turbine started generating: November, 2005
Second turbine started generating: February, 2006
Final turbine started generating: May, 2006
Power per unit: 236 MW |