Reynobond® | Reynolux®

North America

Detroit Public School Buildings
Michigan, USA

Back to List of Projects
Detroit Public School Buildings

Architects:
URS, Grand Rapids, Michigan
Workstage, Grand Rapids, Michigan
 
Fabricator:
Riverside Group, Windsor, Ontario
 
General Contractor:
Workstage, Detroit, Michigan
 
Colors:
Bright Silver Metallic
 
Quantity: 26,000 square feet
 
When the Grand Rapids-based research and development company Workstage teamed up with architect URS to design a series of six new Early Childhood Development Centers for the Detroit Public School System, they sought to create an environment that reflected a tremendous focus on lighting, air quality, sound, technological needs and space. By choosing Reynobond® ACM panels for fascia and coping, the team achieved a smooth, seamless surface that maintained clean, crisp lines throughout all building interiors—creating well-lit, soaring educational spaces.
 
The 26,000 square feet of Reynobond used throughout the six buildings was installed using the Riverside Group’s R4-300 dry joint pressure equalized rainscreen system.  This system eliminates the need for sealants within the panel joints by locating the main seal behind the panels—where they are protected from the exterior elements. The result is a low-maintenance, aesthetically pleasing cladding system with a long service life.

Products Used:
Reynobond® 160 PE Core 4mm

Project Report (PDF):
Detroit Public School Buildings [86KB]

Detroit Public School Buildings
Detroit Public School Buildings

Please consider the environment before printing these documents.
Alcoa Architectural Products Home  |  Sitemap  |  Privacy Policy  |  Legal Notices
Copyright © 2014 Alcoa Inc.